So, we made HUGE progress on our flooring project over the weekend. We now have hardwood floors in the main room, which runs from our kitchen to the wall that the TV is hanging on. We are so happy with the hardwood we selected, and it looks amazing in the space. We are thrilled we didn't go with the other wood we had it narrowed down to, as it was considerably thinner, and would have required much more work. And the room already looks brighter, as the wood reflects what little natural light we get.
Some of you may be wondering, "Why now?" Well, it wasn't too long ago that my friend Liana was over visiting with her daughter, Eva. I was embarrassed as Eva kept picking stuff up off the carpet, and I was grateful that she shows her mom things before putting them in her mouth (what a good little girl!). I quickly realized how unsafe this situation was for children in our home, both our own kids, as well as all the children who we care so much about. So, with a visit from the nieces scheduled, we decided it was as good a time as any. We have about 1.5 weeks until they arrive, and we are hoping to have the project complete, or at least nearly so. Needless to say, we will sleep better at night knowing that our floors are a safer place for kids. Poor Ozzie will no longer be allowed to destroy tennis balls, leaving small pieces of plastic everywhere, that's for sure.
An
ENORMOUS THANK YOU to all those who have helped with the project so far:
- Scott, for his braun which was might handy when moving furniture out of the space
- Ross, for his tebowing technique perfection while removing linoleum (admittedly Justin's least favorite part of the entire project, and the company made it more enjoyable, as if removing linoleum and enjoyable ever belong in the same sentence)
- Josh, for his nailing expertise (and Lauren for letting him come help when under the weather herself)
- My dad, Allan, for his dedication to the project for three solid days. The first day doing prep work with Justin, including screwing down the squeaky spots, trimming door jambs and prep around the fire place, and then laying hardwood for two days, even working when Justin and I had to leave the house for a class. Your amazing dad!
The project isn't complete, but it wouldn't be where it is without the help of so many. Thank you again!